Bioscience

About This Project

ICI painted all the structural ceilings in the upper lab areas. Some of the lab rooms were painted with an epoxy paint for stronger protection and for easy clean up. All the metal doors and door frames were also painted with a special epoxy paint for better protection. There were over 115 rooms, plus 3 floors of corridors to paint. Over 6 months of work and dedication was put into this project to give the client a great product that will last and they will be happy with.

Scope

Open to Structure Coatings

CMU Block Filler

Latex Coatings